Year
|
Company history and activity |
1948
|
Yokota Pump Laboratory was established in Kure.
|
52
|
Self-Priming Centrifugal Pump was completed.
|
53
|
Yokota Pump Manufacturing Co., Ltd. was established in Deshiocho, Hiroshima.
|
56
|
Head office and plant were relocated to Yoshijimacho, Hiroshima and expanded.
0.25ton arc electric furnace was installed.
|
57
|
Received the National Coal Mine Technical Award.
(Hidekuni Yokota and Shingo Yokota)
|
59
|
Company name was changed to Yokota Manufacturing Co., Ltd.. Plant was relocated
to Minami Yoshijima, Hiroshima and expanded. Multistage Self-Priming Pump
was completed. Self-priming high pressure mine shaft drain pump was delivered
to Mitsubishi Takashima Mine.
|
1960
|
Non-Water Hammer Check Valve was completed.
|
61
|
350HP Multistage Self-Priming Pump was delivered to Tanahara Mine.
|
62
|
Wear resistant high Cr cast iron CCR was completed.
|
63
|
Enhanced Self-Priming Pump was completed.
|
64
|
Head office was relocated and integrated with plant. Automatic Water Pumping
System was completed.
|
65
|
Received the Chugoku Science Award. (Hidekuni Yokota and Shingo Yokota)
|
66
|
Enhanced Self-Priming Pump with large bore was delivered to Mitsubishi
Takashima Mine.
|
67
|
Additional plant for assembly and test drive was built.
|
68
|
Received the Purple Ribbon Medal from government. (Hidekuni Yokota)
|
69
|
Direct Flow Water Supply System was completed.
|
1970
|
0.5ton high frequency electric furnace was installed.
|
71
|
Constant Flow Regulator Valve was completed.
|
72
|
Head office building was renewed. Additional test driving plant for large
pumps, and storage structure were built. 1,000mm-bore Non-Water Hammer
Check Valve was delivered to Kitakyushu City.
|
73
|
Corrosion and wear resistant Special Stainless Steel YST was completed.
|
74
|
Large Mixed-Flow Volute Pump for fuel gas desulfurizer was delivered to
Chugoku Electric Power Co., Inc. in Mizushima.
|
75
|
1.5ton high frequency electric furnace was installed.
|
76
|
Large Mixed-Flow Volute Pump for coal fuel gas desulfurizer was delivered
to Electric Power Development Co., Ltd. Isogo Thermal Power Station.
|
77
|
Defoaming Pump was completed. Main processing pump for petroleum protein
was delivered to Romania.
|
79
|
Received the Electricity Rationalized Plant Award.
|
1980
|
Test driving plant for large pumps was renewed and expanded.
|
81
|
Large Mixed-Flow Volute Pump for coal fuel gas desulfurizer was delivered
to Electric Power Development Co., Ltd. 700,000kW Takehara Thermal Power
Station.
|
82
|
Material research laboratory and additional storage structure were built.
|
83
|
Fluorescence X-ray spectroscopy system was installed.
|
87
|
Loop driving system for large pumps and valves was installed. 450mm-bore
Constant Flow Regulator Valve was delivered to Kanto Regional Agricultural
Administration Office.
|
88
|
Large Mixed-Flow Volute Pump for coal fuel gas desulfurizer was delivered
to Electric Power Development Co., Ltd. 1 million kW Matsuura Thermal Power
Station.
|
1990
|
Seawater Resistant Stainless Steel YST130N was completed.
|
92
|
Clean Pump was completed. 600mm-bore Constant Flow Regulator Valve was
delivered to Kanto Regional Agricultural Administration Office.
|
93
|
1,350mm-bore Non-Water Hammer Check Valve was delivered to Amagasaki City.
|
94
|
Float-Type Regulator Valve and Constant Pressure Valve were completed.
|
95
|
Dashpot Type Non-Water Hammer Check Valve (Buffered Closing Main Valve)
was completed.
|
96
|
In-house information network was completed. New production system started
operation.
|
97
|
Dashpot Type Non-Water Hammer Check Valve (Buffered Closing By-pass Valve)
was completed. Pilot-Type Regulator Valves were completed.
|
98
|
Non-External-Flushing Mechanical Seal was completed.
|
2000
|
Degassing Pump and Automatic-Cleaning Strainer were completed.
|
01
|
Liquid-Air Switch Valve was completed.
|
08 |
Received Food Industry Technological Merit Award. |
13 |
Listed on the JASDAQ Securities Exchange. |
16 |
Received Nisshoku Excellent Food Machinery/Material Award. |